Relative Dates

Some date fields allow you to enter what are called relative dates. These dates are stored as offsets instead of fixed values. Why would you need these? Consider the example of a report from which you want all new volunteers in the last thirty days. You can save the report settings and run the report on the first of each month, but when you load the report, it will have as criteria the last dates that you used, not the dates that you want.

Linked Graphic

If we saved the report with these dates, 01/01/2017 and 01/31/2017, when we open them February, the report will still have those dates in it. If instead we used relative dates, in the example below to add/subtract days "-30" in the first field and add/subtract days "0" in the second, when we open the report on January 21st, it will show with dates relative to the current date. Note date fields which hold relative dates show in pink to differentiate them from fixed dates.

Linked Graphic

When we open it on September 20th, the dates will show as August 21 and September 20. To enter a relative date, in a date field which supports it, right-click on the date field and select Relative, or just press the R key in the date field. You can use the hyperlinks (underlined in blue) to quickly assign values. Look for the date field at the end of the drop-down menus to see how you setting calculates.

Linked Graphic

Four different Methods are available for setting the date relative to today: Add/subtract days, Add/subtract weeks, Add/subtract months and Add/subtract years. To always use the current date put in "0" as the Number of days, otherwise select a method and enter a positive or negative value for the number of units to subtract from the current date.

After VSys adds/subtracts the appropriate number of time periods from the current date it can adjust that resulting date, too:

Adjust

Description

No adjustments

VSys uses the date exactly as calculated above.

Start of week

If the result date isn't a Sunday, VSys subtracts as many days as necessary to adjust the date back to a day which is a Sunday.

End of week

If the result date isn't a Saturday, VSys adds as many days as necessary to adjust the date forward to a day which is a Saturday.

Start of month

If the result date isn't the 1st of the month, VSys subtracts days to go back to the first of the month for the date.

End of month

If the result date isn't the end of the month, VSys adds days to get to the last day of the month for the date.

Start of quarter

If the result date isn't the 1st of the current quarter (January 1, April 1, July 1, October 1), VSys adjusts the result date back to the first of the quarter the date is in.

End of quarter

If the result date isn't the last date in the current quarter (March 31, June 30, September 30, December 31), VSys adjusts the result forward to the end of the quarter the date is in.

Start of year

If the result date isn't January 1st, VSys adjusts the date backwards to January 1st of the year the result date is in.

End of year

If the result date isn't December 31st, VSys adjusts the result forward to December 31st of the year the result is in.

Start of fiscal year

If the result date isn't the first date of a fiscal year, as defined in the Setup panel, VSys adjusts the result backwards to the first date of the fiscal year that the result is in.

End of fiscal year

If the result date isn't the last date of a fiscal year, as defined in the Setup panel, VSys adjusts the result forward to the last date of the fiscal year the result is in.

To replace the relative date with a fixed one, just type any date into the field or erase the value from the field altogether.

Not all date fields support relative dates. In these cases the R key does nothing and neither does the right mouse button.

In This Section

Constructing Relative Dates

See Also

Appendix

Installation

Databases

Startup Database Selection

Standalone E-mail Robot as a Windows Service

Issue Reports

Hosted VSys

Q & A

Shortcuts, Tips and Tricks in VSys One

IT Labor Estimates

Implementation Timeline

Ini file-based Advanced Settings

Volunteer Works Conversion Notes

How VSys Encrypts Data - Compatibility Mode

How VSys Encrypts Data - Advanced Encryption

Tracing (Audit Logs) Security

Command Line Parameters

Command Line Tools

Notes on Banned People

Remote Support Sessions

Transitions

Special Settings

Hosted VSys